The bridge-laying tanks Biber serve to cross water and gorges. The rapid armored bridge is 22 meters long, 4 meters wide and it takes 2 to 3 minutes to lay it down. twitter.com/BMVg_Bundesweh youtu.be/Uk9opplS9Lo
Read Also
-
Ballistic missile warnings are back, but the Starlink cap stays, Zelenskyy says: Ukraine’s two US lifelines, one restored
-
No crew, a cargo bed, and pontoons: Ukraine’s MAT1LDA robot is built to cross water with 400 kg
-
A month before the diesel waiver, Trump’s envoys had already pitched Kyiv on Russian gas, NYT says




